JMK Civils is an established, family owned company operating from its headquarters in Altrincham, Cheshire.
Run by the Managing Director, John Kennedy, with over 30 years’ experience within the civil engineering and groundworks industry, and delivering schemes from £10,000 to £2m.
Deep Drainage
Utilities
Bulk Excavation
Highway Construction
Reinforced Concrete Structures
Complete Groundworks
Deep drainage and chamber construction at Garstang WWTW
We know the importance of finishing on time and on budget.
Quality, reliability and communication are at the heart of what we do.
Testimonials
I would like to thank JMK for the help with the sewage project in Alpraham. Everyone concerned has acted in a very professional manner and the project has been completed quickly with very little disturbance to the area.
JMK have always worked in a
very safe and considerate way when on my property.
D Evans
Resident - UU Project
The programme, quality, H&S and financial management on these schemes were managed impeccably throughout by the JMK management and site team.
Based on performance on these two projects, JMK have been added to the Network Plus Services Framework for Metrolink and the MOJ as a partner of choice.
J Pirie
Network Plus
Good on-site team that are well managed and organised. Both D Morgan and JMK have integrated and work well to deliver the project as a team.
J Riseley
D Morgan PLC
Projects
Stockport WWTW
JMK worked on the upgrading of Stockport Waste Water Treatment Works. A new pump station was constructed as well as a gas bag slab and surrounding concrete hardstanding that contained ducting and draw pits.
Plinths to house mechanical and electrical plant were cast on top of slab, and concrete was placed via pump.
Styal Road Pipe Bridge
The existing treatment works inlet pipe (825mm steel) was in poor condition and in need of replacement.
JMK produced a scaffold support deck design to allow removal of existing and installation of new pipe.
Overpumping was required, therefore three 200mm pumps were operated on floats/telemetry during works.
These complicated works were made more challenging due to weather conditions and the isolated location of pipebridge.
Deeside Gateway Infrastructure
Deeside Gateway is a large development of mixed residential and commercial units. JMK undertook infrastructure works that consisted of laying foul and storm sewers from 150mm up to 600mm to depths of up to 6 metres.
Ground conditions were challenging, due to a high water table and running sand. Works were completed efficiently and on programme.
Contact us